© Retsch GmbH, 42781 Haan, Retsch-Allee 1-5, Germany 10.02.2014 0001 Manual Jaw Crusher BB50 Translation
10 Pos: 3.2 / 00 10 BDA Soft war e/Üb ers chr ift en/1 . Ü bersc hr ift en/1 Bes täti gu ng (F or mular für d en B etr eib er) @ 0\mod_120887
11 Pos: 5.1 / 00 20 Ü bers chr ift en/ 1. Ü bers chri ft en/ 1 Tec hni sch e D aten @ 0\mod_1222344525522_9.docx @ 2407 @ 1 @ 1 3 2BTechnical d
2BTechnical data 12 Pos: 5.6 / 00 20 Ü bers chr ift en/ 1.1 Ü ber sc hrift en /1.1 Üb ersc hri ften BD A/11 Fu nkti ons weis e @ 0\ mod_1222344
2BTechnical data 13 Pos: 5.8 / 00 20 Ü bers chr ift en/ 1.1 Ü ber sc hrift en /1.1 Üb ersc hri ften BD A/11 Sc hutz einr ic htung en @ 0\mod_
2BTechnical data 14 Pos: 5.22 /0 020 Über sc hrif ten /1.1 Ü b ersc hri fte n/1. 1 Ü ber schri fte n BD A/1 1 A bmes su ngen un d Ge wic ht R et
Transport, scope of delivery, installation 15 Pos: 7.1 / 00 20 Ü bers chr ift en/ 1. Ü bers chri ft en/ 1 Ver pac ku ng, Tr ans p ort und Aufst
Transport, scope of delivery, installation 16 Pos: 7.13 /0 025 War nhi nweis e/H 001 1 H INW EIS Luf tfe ucht igk eit @ 0\ mod_1228918882628_9.
Transport, scope of delivery, installation 17 2 Year of production 3 Part number 4 Serial number 5 Manufacturer’s address 6 CE marking 7
Transport, scope of delivery, installation 18 Fig. 6: Mounting the transport aid • Fix the two transport aids (W) using screws (WS) to the machin
Operating the machine 19 Pos: 9.1 / 00 20 Ü bers chr ift en/ 1. Ü bers chri ft en/ 1 Be die nung de s Ger äte s @ 0\ mod_1226565880211_9.docx @
2 Copyright © Copyright by Retsch GmbH Haan, Retsch-Allee 1-5 D-42781 Haan Federal Republic of Germany
Operating the machine 20 Fig. 10: Machine partially open Pos: 9.4 / 00 05 R ETSC H/ 00 05 RET SC H B edie nung s anlei tung en Kapi tel sa mml un
Operating the machine 21 Pos: 9.5 / 00 20 Ü bers chr ift en/ 1.1 Ü ber sc hrift en /1.1 Üb ersc hri ften BD A/11 Üb ersi cht stab ell e d er G
Operating the machine 22 Pos: 9.8 / 00 20 Ü bers chr ift en/ 1.1 Ü ber sc hrift en /1.1 Üb ersc hri ften BD A/11 B edien el eme nte und Anzei
Operating the machine 23 Pos: 9.13 /0 020 Über sc hrif ten /1.1 Ü b ersc hri fte n/1. 1 Ü ber schri fte n BD A/1 1 E in- / Auss ch alt en @ 0\
Operating the machine 24 Fig. 14: The display (F1) shows 00.0. The current gap width and the display therefore match. The wear of the breaking jaw
Operating the machine 25 Pos: 9.19 /0 020 Über sc hrif ten /1.1 Ü b ersc hri fte n/1. 1 Ü ber schri fte n BD A/1 1 R ev erse - Ver ma hlung @
Operating the machine 26 Pos: 9.23 /0 020 Über sc hrif ten /1.1 Ü b ersc hri fte n/1. 1 Ü ber schri fte n BD A/1 1 M ahl vorg ang st art en @ 0
Safety functions and fault display 27 The red LED above the STOP button lights up and the green LED above the START button goes out. The machine s
Cleaning, wear and service 28 Pos: 12.1 /0 020 Über sc hrif ten /1. Ü ber sc hrift en /1 R eini gu ng, V ersc hl eiß und Wart u ng @ 0\mod_122
Cleaning, wear and service 29 Pos: 12.7 /0 020 Über sc hrif ten /1.1. 1. Über sc hri ften /11 1 Rü cks pri tzsc hut z en tfer nen @ 5\mod_1345
3
Cleaning, wear and service 30 7.2.2 53BReplacing the front breaking jaw NOTICE Zircon breaking jaws (ZB) are bonded across the entire surface (ZV).
Cleaning, wear and service 31 • Pull the bolt (G) out of the guide. • Place the bolt (G) in the removal groove (Rn) of the front crusher arm.
Cleaning, wear and service 32 Fig. 29: Screw securing adhesive • Use two new screws (RS) for installation or secure both screws with liquid s
Cleaning, wear and service 33 Fig. 31: Screw securing adhesive • Use two new screws (RS) for installation or secure both screws with liquid scre
Cleaning, wear and service 34 • Simultaneously press the buttons RESET+START for 2 seconds. The currently set operating time until calibration flas
Disposal 35 Pos: 13.2 /0005 RET SCH /0 015 R ETSC H Rep arat ur- u nd M on tag eanl eit ung en/ 0000 0 Ü bers chri fte n/1. Üb ers chr ifte n/1
36 9 8BIndex – Verzeichnis8 88.8/888 27 A Aligning the gap width 23 Ambient temperature 15 Amperage 17 Atmospheric humidity 15 B Bar code 17 Bonding
37 Removing the transport lock 18 Removing the transport safeguard 18 Removing Transport Safeguards 17 Repairs 9 Replacing the breaking jaws 29 Requi
Authorized person for the compilation of technical documents: J. Bunke (technical documentation) The following records
4 1 Notes on the Operating Manual ... 6 1.
Copyright ® Copyright by Retsch GmbH Haan, Retsch-Allee 1-5 D-42781 Haan Federal Republic of Germany
5 7.1.2 Removing the splash-back protection ... 29 7.1.3 Remo
6 Pos: 1.1 / 00 05 R ETSC H/ 00 15 RET SC H R epar atur - un d M ont age anl eitu nge n/0 0000 Üb ersc hri ften /1. Über sc hrif ten /1 H inw eis
7 Pos: 2.2 / 00 20 Ü bers chr ift en/ 1.1 Ü ber sc hrift en /1.1 Üb ersc hri ften BD A/11 Er klär ung en z u den Sich erh eits warn ung en @
8 Pos: 2.5 / 00 20 Ü bers chr ift en/ 1.1 Ü ber sc hrift en /1.1 Üb ersc hri ften BD A/11 G enerel l e Si cher heit shi nwei s e @ 0 \mod_122234
9 Pos: 2.11 /0 020 Über sc hrif ten /1.1 Ü b ersc hri fte n/1. 1 Ü ber schri fte n BD A/1 1 R epar atur en @ 0 \mod_1223624336511_9.docx @ 2978
Kommentare zu diesen Handbüchern